TERVIAGRUPO EMPRESARIAL
TERVIA Geohidrología

Water you cannot see still needs managing.

Groundwater engineering with independent judgment: we study the subsurface, inspect the well and document every decision. We do not drill and we take no commission from drillers.

Concepts

Hydrology vs. hydrogeology

HydrologyHydrogeology
What it studiesWater flowing over the surface.Water stored and moving underground.
Where the water isRivers, streams, lakes and reservoirs.Aquifers, water table, wells and springs.
How it movesRunoff.Infiltration and groundwater flow.
Unit of studyThe watershed.The aquifer: porous or fractured media.
RisksFloods and drought.Falling water levels, poor water quality and land subsidence.
ApplicationsDams, levees and watershed management.Well siting and design, recharge and monitoring.

They are complementary: water seeping through a riverbed recharges the aquifer, and the aquifer resurfaces in springs and rivers.

Regional context

The La Laguna aquifer

518.9hm³/yr average recharge
1,221.8hm³/yr extraction
140 mdrawdown in the most affected area
1.25 maverage decline per year
Aquifer type

Two media store the water: granular valley sediments (sand, gravel and clay) and fractured calcareous rock. The system ranges from unconfined to semi-confined, and is confined in some areas.

Balance

Extraction far exceeds recharge, which comes mainly from rainfall on the valley, lateral underground inflow and irrigation return. The aquifer is officially closed to new concessions.

Water quality

Arsenic and fluoride occur naturally in the region's geology. Water quality changes as wells go deeper, so every well needs testing, not assumptions.

What comes next

The Agua Saludable para La Laguna project aims to replace part of urban pumping with treated surface water from the Nazas River. For agriculture, groundwater remains the foundation: it must be protected and measured.

Source: CONAGUA, water availability determination for aquifer 0523 Principal-Región Lagunera (1999 balance, published 2002). Reference figures; current values may differ.

Patch installedSlotted casing beginsStatic levelOval casingBowl leakBreak · sediment
Illustrative example of a video inspection log.
Operating well

Video inspection: see before you repair

A camera travels down the well and records the condition of the casing and equipment at every depth. That record tells you whether to rehabilitate —expand oval casing, install patches, clean— or replace the well, instead of guessing.

  • Patches and earlier repairs
  • Start and condition of slotted casing
  • Static level and water turbidity
  • Oval or collapsed casing
  • Leaks in the column or bowl
  • Breaks and sediment level